Installation Guide
5 HOMEDEPOT.COM/GLACIERBAY
Please contact 1-855-HDGLACIER for further assistance.
Installation (continued)
2
Cutting the installation hole
□ Drill a pilot hole and cut the countertop opening. Use the
appropriate cutting tool for the surface you are cutting and
cut along the inside of the template line.
3
Marking the clip locations
□
Place the sink underneath the countertop cutout; and check if the cutout is t for the sink; adjust the cutout if necessary.
Place a stand under the sink to facilitate installation and avoid dropping.
Place the mounting clips (AA) as shown in the attached template and mark the centers of the clip on the countertop.
□
1
Preparing the countertop
□
□
□
Us
e th
is
line
for FLUSH MOUNT CUT
.
Cutout for U
nder M
oun
t I
nsta
llat
ion
B
Check the template (B) and select the cutline you want: line B1
is bowl size; line B2 is 1/2 in. wider than bowl size. If you choose
line B1, please tear off the template through the broken line.
Place the template (B) on the countertop. Ensure the
template is centered on the counter so that it is parallel
to the counter edge and that the installation hole will not
interfere with the structure of the cabinet.
Tape the template (B) to the countertop to keep it in place
and trace the cutout line on the template (B) with a pencil.
r FL USH MOUNT CUT.
nder Moun
t Installation
B1
B2
4
Drilling the mounting holes
□
□
Drill mounting holes in the clip center mark from the previous step.
Insert the inserts (BB) in the holes so they are completely inside the hole. If necessary, gently tap the insert.
BB
AA