Installation Instructions

3
TOOLS
Tools
GearTrack
®
Channels GearWall
®
Panels
Masonry
/ Poured
Concrete
Bare Wood
Studs
Drywall Over
Wood Studs
½”(1.3 cm),
5
/
8
” (1.6 cm),
¾” (1.9 cm)
Masonry
/ Poured
Concrete
Bare Wood
Studs
Drywall Over
Wood Studs
½”(1.3 cm),
5
/
8
” (1.6 cm),
¾” (1.9 cm)
Level
Tape Measure
Cordless Drill
1/8” (3 mm) Drill Bit for
Pre-drilling holes
Stud Finder
Ac Finder
Square
Pencil
Jigsaw
Circular Saw
Chalk Line
Line Level
Hammer Drill
Caulk Gun
Chalk Line With Plumb
Bob
³⁄
16
”(4.7 mm) X 5"(12.7
cm) Masonry Drill Bit
5
/
32
”(3.9 mm) Masonry
Drill Bit
IMPORTANT: Compare screw length to electrical wire locations.
Be sure the screw will not pierce electrical wiring.
NOTE: Maximum weight limit is 75 lbs per linear ft (30.48 cm) for
GearTrack
®
Channels and 50 lbs per sq ft (2.39 kPa) for GearWall
®
Panels
Screw thread engagement into the wooden stud should be 1”
(2.54 cm) minimum. For drywall of a thickness not listed in the
chart above, see graphic below.
GearWall
®
Panel GearTrack
®
Channel
A
B
C
D
E
A
B
C
D
E
A. Drywall
B. Wooden stud
C. Flat-head screw in
every slot at every stud
D. 1” (2.54 cm) min. to 1¼”
(3.17 cm) max. if near
wiring
E. ¼” (6.3 mm)