Installation Instructions

4
Install the GearTrack
®
Channels
Prepare the Wall
Masonry Block / Poured Concrete Wall
Before installing GearTrack
®
to masonry walls, you must waterproof the walls to avoid mildew or foundation damage. Walls that
appear dry may actually become damp when enclosed by paneling. Install the channels in accordance with all local codes and
ordinances.
Wood Studs and Drywall over Wood Studs
Use a stud nder to mark the edges of the studs within
your planned installation area. Be sure to also mark the
locations of electrical wiring.
IMPORTANT: Compare screw length to electrical wiring
locations. Be sure the screw will not pierce electrical
wiring.
Stud Finder
1. Locate Studs and Electrical
GearTrack
®
Channels should be mounted to the wall so
that they begin and end at wooden studs. Measure from
the center of the stud at the beginning of the desired
coverage area to the center of the last wooden stud that
is within 32” (81.3 cm), 42” (106.7 cm) or 48” (121.9 cm),
depending on the length of your GearTrack
®
Channel.
2. Measure the Channels
If necessary, cut the rst channel to this length, making
sure the cut is square.
NOTE: Channels cut to shorter than 24” (60.96 cm) long
should not be used.
3. Cut to Length