Specification

FRP Wall & Ceiling Liner Panels
097700 - 6
D. Lay out liner panels to minimize joints. Use full panels where possible.
E. Cut liner panels in accordance with manufacturer's instructions for proper installation.
F. Expansion and Contraction:
1. Install liner panels with gap at ceiling, floor, and between panels in accordance with
manufacturer's instructions to allow for expansion and contraction of panels due to
changes in temperature.
2. Allow for expansion and contraction of liner panels when pre-drilling holes for fasteners
and when installing around penetrations, including pipes, conduits, and electrical outlets.
G. Moldings and Sealants:
1. Install moldings and silicone sealant with liner panels in accordance with manufacturer's
instructions to achieve moisture-resistant installation.
2. Remove excess silicone sealant during installation or trim after silicone has cured.
H. Adhesive: Apply adhesive in accordance with manufacturer's instructions along with fasteners
when installing liner panels.
I. Fasteners:
1. Install liner panels with non-corroding fasteners.
2. Use fastener type and size as required for installation.
3.4 CLEANING
A. Clean liner panels promptly after installation in accordance with manufacturer's instructions.
B. Do not use harsh or abrasive cleaning materials or methods that would damage liner panels or
finish.
3.5 PROTECTION
A. Protect installed liner panels and finish from damage during construction.
END OF SECTION