Installation Guide

BEFORE YOU START
The most fragile parts of tempered glass panels are the corners. Therefore, it is critical you have the rubber blocks in place so the glass
never touches the tile surface you are installing onto. Please make sure the glass is always on blocks while out of the packaging prior/during install.
Rubber block is provided in your hardware pack however you can use wood, cardboard or other rubber products to protect against breakage.
Silicon is not provided this will need to be purchased separately. We recommend using clear, mold resistant silicon which be purchased at
your local hardware store.
The items included for this shower door model are listed below. This model ships in 2 packages:
1. Fixed panel
2. Hardware pack – (3 mounting clips)
PART ONE Install Fixed Panel
1. On the wall where the fixed panel is to be placed, use a spirit level to mark a level vertical line.
a. This line is where you will be attaching the 2 clips to the wall.
i. TIP: We recommend using a pencil so this can be easily removed.
2. Mark the center point for the two clips.
a. Top clip: measure 50 inches from the tub up along the vertical line and mark this point.
b. Bottom clip: measure 8 inches from the tub up along the vertical line and mark this point.
c. The third clip for the bottom should be placed 31” from the wall.
NOTE: If you are fixing the bottom clip to a fiberglass bathtub edge, use a 1/8ʺ drill bit to pre-drill the hole
rather than 1/4ʺ tile drill bit. You will not use the green wall anchor but rather screw the clip directly into the
tub edge.
3. Drill clips to the wall / floor.
a. Drill holes using a ¼” tile drill bit and insert the plugs provided.
b. Place clip over hole and drill in screws to secure the clip. Make sure these are tightly secured to wall.
4. Set the fixed panel in place.
a. Place the 1/8” thick rubber block provided on the tub surface 1 ½ inches from the edge closest to wall,
place the 1/16” rubber block inside the clip on the bathtub, this is to prevent the glass touching the
bathtub or clip where all the weight is. No blocks are required in the clips on the wall. There are extra
rubber blocks in case your tub is not level. These rubber blocks are found in the small yellow envelope
stapled to your instructions.
b. Carefully place the fixed panel on the rubber blocks and in bottom clip and slot the glass into the clips on
wall.
i. IMPORTANT: The most fragile parts of the glass panels are the corners. Therefore, it is critical
you have the rubber blocks in place so the glass never touches the tile surface you are installing
onto.
5. Ensure the fixed panel is level.
a. On the glass edge furthest from the wall use a spirit level to make sure the fixed panel is level and in
line.
i. TIP: Use additional rubber blocks on either existing blocks to raise/drop the fixed panel if
required.
Instructions continued over page