Installation Guide

08
Measure and place Rubber Blocks.
If you are not drilling into the shower base and prefer
the Rubber Blocks option instead of using the Boom
Clip, continue here.
Measure 3 ⁄" from wall and place the first ⁄" thick
Rubber Block. Take the Fixed Panel width and subtract
3 ⁄" and measure from the wall and place the second
⁄" thick Rubber Block. The Fixed Panel will rest on
the Rubber Blocks.
31⁄2"
3 1⁄2"
07
Install and level Fixed Panel into the Clips.
Carefully place the Fixed Panel into Wall Clips, Boom
Clip and on to Rubber Block. Make sure the Fixed Panel
is set all the way into the Wall Clips. Use a level to make
sure the Fixed Panel is level. Tighten Clip screws.
Please continue to step 10 to complete installation.
Important: There is stamp on the corner of all Glass Warehouse glass panels to certify it is tempered
safety glass. We recommend that panels be installed with the stamp at the boom corner closest to
the wall where it is less noticeable. On Door Panels, the stamp must be at the boom of your enclosure
to align properly. Note: the stamp is baked on during the tempering process and cannot be removed.
Tip: Use additional Rubber Blocks on
either existing blocks to raise/drop
the Fixed Panel if required.