Installation
10
DO NOT ALTER OR CHANGE THE WIRING PROVIDED.
• Be sure the rough wiring is positioned correctly within the rough opening or
behind the surface mounted unit.
• Rough wire for this unit should extend a minimum of 20” to make the connections.
• See diagram EL1 for the access points.
110v outlets
LED Light
Heated Door Defogger
switch (blue)
Integral LED Light
Switch (white)
6
White Opal Acrylic shelf is packed separately and must
be placed in position after installation along with the
other shelves provided.
Defogger
Tether
• The Door has a heated defogger that plugs
into the bottom of the Electric Option shelf unit.
• The left or right hand door designation must
be made at the time of order.