Installation

7
1. Draw pencil line with a level
to locate the bottom surface mount
wall bracket for the base
of the bottom unit.
Install with screws to studs.
2. Place bottom cabinet into position and
check for plumb and level.
Fit VTS Wall Bracket into place and
mark for screw position.
Pre-drill holes,then reassemble
bottom cabinet and screw VTS Bracket
into place.
3. Place VTS Spacer in position.
(DO NOT REMOVE TAPE COVER
FOR TWO SIDED TAPE UNTIL
YOU HAVE TESTED COMPLETE FIT
OF BOTH UNITS).
4. Test fit the top unit and re-check for
plumb and level. Be sure that both units
have the door hinge on the same side.
7. Fix top cabinet in place with the tape and
top mounting brackets.
6. Clean the top of the bottom cabinet to be
sure that the spacer will adhere in place.
Fix the spacer with the double face tape to
the bottom cabinet.
Test fit the top cabinet before removing
the double face tape cover that will hold
top cabinet in place.
5. Hold top unit in place;
slide Top Brackets into the top groove
of the cabinet and postion for stud location;
mark for drilling. Pre drill the holes for the
location of the Top Surface Mount Brackets.
8. Position the
VTS Finish Trim.
This will cover
the 3/4” spacing
between cabinets.
(If studs are not in the
correct location for
support, drill and install
wall anchors.)
1
3
2
4
5
6
7
8
Surface Mounted Vertical Tier System