Installation Guide

Step 18
Refer to Diagram 24 and
fit roof sheets in the
sequence shown in the
“Roof Sheet Installation
Number Sequences” Diagram
at the bottom of this page,
ensuring they are the correct
way up, and the side edges
overlap the corresponding
roof starters.
First, secure the front edge to the
top of the front fascia panel using
nuts and bolts as shown in Diagram 24.
NOTE: insert the nuts and bolts from
the bottom and place the washers
under the nuts.
Then secure the back and side
edge using screws, nuts and bolts
as shown in Diagram 24.
NOTE FOR 3' DEEP SHEDS ONLY:
Nut & bolt into side edge is NOT required.
Continue fitting sheets using screws,
nuts and bolts, depending on the
roof sheets used (full or half).
See Diagram 25.
21
ROOF SHEET INSTALLATION NUMBER SEQUENCES:
FULLFULL
12
FULLFULLFULL
1
HALF
2
3
4
FULL FULL
1
HALF
2
3
5' WIDE
2 x full roof sheets
8' WIDE6' WIDE
3 x full roof sheets, 1 x half roof sheet2 x full roof sheets, 1 x half roof sheet
FRONT
BACK
RIGHT SIDE
4 SCREWS
ALONG
BACK EDGE
1 NUT & BOLT
IN CENTRE HOLE
OF SIDE EDGE
NOTE: NOT REQUIRED
FOR 3' DEEP SHEDS
IMPORTANT:
EDGE WITH THE
MOST HOLES
IS AT BACK
4 NUTS &
BOLTS
ALONG
FRONT EDGE
NOTE:
INSERT BOLTS
FROM THE
BOTTOM.
FULL
ROOF SHEET
EDGE OF
FULL
ROOF SHEET
TO OVERLAP
EDGE OF
ROOF
STARTER
Diagram 24
WASHER
MUST BE
PLACED
UNDER
NUT.
NOTE: NUT & BOLT
IN CENTRE HOLE OF SIDE EDGE
NOT REQUIRED FOR 3'
DEEP SHEDS
FRONT
Diagram 25
BACK
FULL
ROOF
SHEET
EDGE
OVERLAPS
FIRST
SHEET
EDGE
OVERLAPS
ROOF
STARTER