Owner manual

17
Diagram 7.1
14806
7 Boiler Fixing
7.1 Wall Hanging Bracket
The Wall Hanging Bracket is supplied in the main boiler
packaging.
Reposition the wall template over the ue hole and mark
the position of the xing holes for the hanging bracket, see
diagram 7.1.
NOTE: Due to the varied site conditions we do not supply
xings and advise that the installer should supply those which
are suitable.
Drill xing holes and insert suitable wall plugs.
Direct Rear Flue only - If external access is not available the
ue to be used should be assembled as described in sections
10.11 to 10.13 and inserted through the hole in the wall before
tting the wall hanging bracket.
7.2 Boiler Hanging
IMPORTANT: With regards to the Manual Handling
Operations, 1992 Regulations, the following lift operation
is deemed to be a one man lift, refer to section 17 Manual
Handling.
IMPORTANT: Direct Rear Flue only - The direct rear ue
must be tted before hanging the boiler, refer to sections
10.11 to 10.13, and the rear outlet cover plate should be
removed.
Lifting the boiler into position, lean the top of the boiler slightly
to the wall and position just above the hanging bracket. Lower
the boiler slowly, push back and engage onto the hanging
bracket making sure the boiler is located over the retaining
bosses, secure with screw provided, see diagram 7.2.
Diagram 7.2
14807
SECURING
SCREW