User guide

18
221786B
9 Fault Finding
Re-connect boiler flue blockage
safety device to points A and B.
Disconnect thermocouple at
connection point D of the gas valve.
Test continuity between point C and the
body of the gas valve.
Is there continuity?
Test continuity of thermocouple between inner
connection point D and point E.
Is there continuity?
Faulty boiler flue blockage
safety device, renew.
Thermocouple and boiler flue blockage
safety device circuit satisfactory.
NO
YES
YES
Faulty flue blockage safety device
connectors into gas valve,
either at A or C.
Renew where faulty.
Faulty thermocouple, renew.
With the boiler cold, check connections of the thermocouple, boiler flue blockage safety device
and gas valve. Reset flue blockage safety device.
Disconnect flue blockage safety device connectors at points A and B at the gas valve,
see diagram Interrupter Electrical Connections.
Test continuity of the flue blockage safety device. Is there continuity?
YES
NO
NO
Diagram 9.4
FUNCTIONAL FLOW WIRING
2327/B
Diagram 9.3THERMOCOUPLE FAULT FINDING
9.1 Pilot
Refer to chart 9.1.
9.2 Thermocouple
Refer to chart and diagram 9.2.
9.3 Electrical
Refer to diagram 9.3 and 9.4.
The preliminary electrical system checks as contained in a
multimeter instruction book are the first checks to be carried out
during fault finding.
On completion of any fault finding task which has required the
breaking and remaking of electrical connections then the checks,
earth continuity, polarity and resistance to earth, must be
repeated.
9.4 Flue Blockage Safety Device
If the device operates it indicates there is a problem with the
chimney. Make sure that the air vents are free from obstruction.
Carryout spillage checks as Section 2.3.
INTERRUPTER
ELECTRICAL CONNECTIONS
Diagram 9.2
POINT "C"
CONNECTION "B"
CONNECTION "D"
CONNECTION "E"
FLUE
BLOCKAGE
SAFETY
DEVICE
CONNECTION
"A"
5316
PERMANENT
LIVE
230V
50Hz
3A FUSE
THERMOSTAT
L RED
CNC
BROWN
MULTI-FUNCTIONAL
CONTROL
SOLENOID
BLUE
N
34
9008