01119 ASSEMBLY INSTRUCTION SKU CODE: (WF198578-WF198579) This set is included 2 boxes if don't receive full 2 boxes please contact our customer service team SAFETY WARNINGS Follow the information on the waning label appearing on the upper bunk end structure and on the carton... Do not remove waning label from bed. Amway use the recommended size mattress or mattress support, or both, to help prevent the likelihood of entrapment or falls.
Hardware List 210 x 40 mm Screws 1/4" x70 Wood dowel PCs PCs Wood Screws 88pcs wd Cae @1/4" x 80 mm 21/4" x 13 mm 212x110 mm Hex-Head bolts PCs Horizontal-Hole bolts PCs Wood dowel PCs Screws 1/4" x50 @1/4" x 30 mm Wood Screws PCs PCs Hex-Head bolts PCs no 1 n2 21/6" x 25 mm Handle Wood M3.
Using hardware #2.#3 and dowel #1 to complete Foot board and Headboard. Look at detail view for more detail STE P 1 » Following below illustration Assembly Foot board and Headboard.
Following below illustration Using hardware #4, #5 and dowel #1 follow detail view to Assembly Bottom bed's Headboard and Foot board with side rail at detail view for more detail > PCs PCs 2) S PCs Inside Side Rail View STE Following below illustration: 9 Connect 2 slats D1 with 2 Leg(center) AB by using hardware #9.
|A3 and A4 legs with B2 Frame. Using hardware #7 connect B2 Frame with Steel Rack #16 |-Using hardware #3 connect B1 Wood bar with B2 Framework legs to complete LEFT side of Upper Bed STE P 4 “Following below illustration Assembly Upper bed's Headboard.
|A3 and A5 legs with B2 Frame.
6 | PCs) |4(pcs) Upper Bed (Completed on step 7) on of Bottom Bed legs with ind Bottom Bed ent fix Upper Following below illustration. Lay the Bottom Bed (Completed from step 3). Using the Dowel #6 to connect head end of Upper Bed legs.
FN 1 Sing hardware #2 and dowel #1 follow detail view to Assembly detail rail Frame C1.
7 PCs Following below illustration. Using hardware #9 connect Frame(Completed on step 10-1) with Ladder (Completed on step 8).
STE CONGRATULATION.