Installation Guide

Canopy
Hex nut Nipple
1ea 130*H22mm 1ea 1/2"*H3mm 2ea 1/2"*H55mm
Chain Wire Connnector
Bottom cap
1ea 3.8mm*L72" 2ea A3 Orange
1ea 50*H56mm
Chain connector Mounting Screw Finial
2ea 5*H58.5mm 2ea 8/32"*H1" 1ea 22*H40mm
Mounting Strap
w/ ground screw
Canopy Loop
and Canopy
loop collar
1ea 100*22*H4mm
/1ea 8/32"*H10mm
1ea 1/2"*H46mm
Crystal draping
A7 x 5pcs
Crystal drops
B2 x 15pcs
Crystal drops
B5 x 5pcs
Crystal drops
C3 x 5pcs
Crystal drops
D4 x 1pcs
Part Needed Quantity
Part Needed
Quantity
Reason why
Comments
FIXTURE ASSEMBLY INSTRUCTIONS
NOTE: THE SHADE ASSEMBLY CAN BE DAMAGED BY
ROUGH HANDLING. USE CARE WHEN ASSEMBLING.
For Customer Service, contact the place of purchase to arrange for replacement parts.
1. Feed the fixture wires through the long Threaded rod (F)
and pull the wires until taut.
2. Slide the tube (E), tube lid (D), cup (C), long Threaded rod
(F), Top cap (B), Top loop (A) down to housing of fixture.
3. Screw Threaded rod (F) all the way into the coupler (L) at
housing of fixture. Screw Top loop (A) into Top cap (B).
8981-5 BRI / GRM
Read and review installation instruction sheet before
assembling the fixture.
Fig 1
PARTS & ASSEMBLY SHEET
This fixture assembled PO:__________ Date: ________
Fixture Name: Echelon 8981-5 BRI / GRM
Crystal drops are included in
parts bag. (see crystal assembly
instruction)
Notice:
Please review the parts listing and check for all parts before assembling the fixture. If any parts are
missing or damaged, please note on this sheet and contact the place of purchase to arrange for
replacement parts.
PARTS LIST
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Fig 1

Summary of content (5 pages)