User Manual

Mounting Strap
Junction Box
Screw
Mounting Screw
1ea 4"X3" 2ea 8/32"X1" 2ea 8/32"X28mm
Wire
Connnector
Hex Nut
Deco Nut
(round nut)
3ea P3 Orange 2ea 8/32"X3.5mm 2ea 9X9.5mm
Green Ground
Screw
Bulb
1ea 8/32"X10mm
3ea G9*40W
Part Needed Quantity
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
NOTE: INSTALL THE GLASS ASSEMBLY
AFTER THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.
PARTS LIST
Fig. 1
Company Name:_______________________Co. Account #:___________
below to be filled out by retailer
FIXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet
before assembling the fixture.
7509-BA3 PW
PARTS & ASSEMBLY SHEET
Fixture Name: Asteria 7509-BA3 PW
This fixture assembled PO:__________ Date: ________
Notice: Please review the parts listing and check for all parts before assembling the fixture. If any parts are
missing or damaged, please note onthis sheet and contact the place of purchase to arrange for replacement
parts.
1.Pour Crystals (Y) into the groove of Glass Shade (O). Then,
gently slide Glass Shade (O) over the socket and secure Glass
Shade (O) by threading Socket Ring (L) over the socket.
2. Thread the Final Cap (R) into Bath Bar (S) unitl tighted.
3. Install the provided light bulb in accordance with the fixture's
specifications. Bulb note: Use a tissue or paper towel to hold
the bulb and push down into the socket. Oils or dirt can cause
the bulb life to shorten. Rubbing alcohol is recommended to
clean the bulbs if dirty.
(DO NOT EXCEED THE MAXIMUM WATTAGE RATING!)

Summary of content (3 pages)