FSM Cable Installation & MEU Activation
Page 11 of 43 Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
Test Tags:
You will be placing Test tags in the store during the installation process if they were not
installed during the Pre-Installation survey. (Appendix D provides information on the
placement of the test tags.)
1) Check SYSMON and verify to see if the test tags were entered for this store.
2) If test tags are not in SYSMON and were not installed in the store then go to step 4.
3) If test tags were entered in SYSMON verify that they are still present in the store. If any of
the test tags are missing, replace them with new ones and then update SYSMON with the
new tags. Go to step 6.
4) Using the Test Tag Inventory Sheet place 11 test tags in the store at their designated
location and 7 test tags in the stock room.
5) Enter the Test Tag information into SYSMON.
6) You are now complete with the installation of Test Tags.
NOTE: It is best to have the test tags entered into SYSMON prior to the initial MEU dial in
from that store. This will allow the test tags to update properly and be visible in
Sysmon after the first cycle of the MEU. Otherwise you will have to allow for a
second scan and data dump before you will see your tags.
Display Tags:
During the install process you will be placing RFID tags on the displays for the current
campaign list. This should be about 25 to 30 campaigns. You will need the current campaign
list, tags, batteries, envelopes, tape, and the Goliath Tag Installation Report (Found in
Appendix E.)
1) Walk through the store finding displays for the current campaign list.
2) Place a tag on the display at the designated location and record the information in you
Goliath Tag Installation Report.