User's Manual
Walgreens Installation Guide
G-1-2002-2B
Walgreens Installation Guide 2B.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page: 2-5
Validate the Store Floor Plan:
The first step in the pre-installation store survey is to validate that the provided store floor
plan is correct and matches the actual store floor plan.
If the store floor plan is not
correct; go to the Floor Plan Questions section found in the “
Walgreens Store Floor
Plan Reference Guide
”. Gather the information asked in these questions and then
contact the Help Desk. The Help Desk will then help determine the actual floor plan.
Determine if Power is available for the MEU by the Front Security Screen:
The power source for the MEU must be an open uninterrupted 24-hour power source. It can
not be plugged into a cube tap, power strip or a UPS used by a LAN cabinet or computer.
Check power at this location prior surveying the CMU location.
Determine CMU Installation Location:
1) Check the Photo department for the Secondary Communications cabinet (also known
as the Catalina cabinet). The cabinet may be mounted on the wall or on the wall
inside the yellow storage closet
located in the Photo department. If the Catalina
cabinet is not found in Photo, then look around the store and try to find the cabinet;
most stores have a Catalina cabinet. Other locations where the cabinet may be
located are:
Break room
Electric room
Stock room
Tech room
Hallways
Behind a photo machine
Managers Office
Examples - Wall Mounted Catalina Cabinets in the Photo Department
Catalina Cabinet
located inside
yellow storage
closet










