User's Manual

Walgreens Installation Guide
G-1-2002-2B
Walgreens Installation Guide 2B.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page: 2-8
d) Validate that the port designated for Goliath is available on the switch.
e) Determine if there is a dedicated uninterrupted 24-hour power source available by
the communications cabinet. Do not use power strips or UPS units. The power
supply must be able to reach the CMU at its designated location and the power
source.
Port 46
on the
48 Port Switch
connect switches
together or to the
patch panel.
Port 46
Switch 2
Switch 1
Patch
cable with
orange cap runs
to the patch
panel.
Patch Cable
connecting
Switch 1 to
Switch 2
Two 48 port switches
inside of the
Communication
Cabinet in the
Pharmacy