Chapter 3 - INSTALLATION COMPLETION:
Installation Completion:
1) Verify that all cables are securely connected to the MEU at the corresponding ports.
2) Power the MEU on and verify that the green power indicator is lit.
3) Call the Help Desk to begin the system tests (approximately ten minutes).
4) Document the store installation with a digital camera.
5) The Lead Technician must inspect the entire store, including the Stock Room, for any
installation debris left by the Crew.
6) Remove any debris from the drop-ceiling around the MEU including, but not limited to,
port caps, cable tie fragments, electrical tape fragments, hand tools, etc.
7) The Lead Technician is responsible for inspecting the entire store, including the Stock
Room, once more to ensure that all traces of the installation have been removed.
8) The Lead Technician is also responsible for verifying that all ceiling tiles are properly
replaced in their original condition.
Documenting the Store Installation:
At the completion of the installation the CIT must document the installed Goliath System
with a digital camera. The following pictures are required.
1) A picture of the installed MEU
2) A picture of the installed power source for the MEU.
3) A picture of the installed CMU.
4) A picture from the stock room of the entry point of the cables into the stock room.
5) A picture of the installed Tx/ATA and Rx/ARA antennas in the stock room. The
picture must clearly show the service loops. A second picture may be required if
all the devices can not be included in one picture.