User's Manual

Walgreens Installation Guide
G-1-2002-2B
Walgreens Installation Guide 2B.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page: 2-63
4) Attach the coaxial cables to the MEU. All excess cable should be secured in a minimal
service loop using cable ties.
5) After all of the coaxial cables are connected to the MEU and all of the Tx/ATA and
Rx/ARA antennas are installed connect the power cable to the MEU.
6) The bottom of the MEU with coaxial cables attached should be about 6 inches above
the ceiling grid.
7) Attach a Goliath Solutions grid label sticker on the drop ceiling grid to indicate the
location of the MEU.