User Manual Part 1

Introduction to Store Install Processes Guide
G-1-2001-2
Introduction to Store Install Process Guide-2.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page 1-6
Ramset Safety:
When installing a store with a concrete ceiling a Powder Actuated Ramset or an
equivalent tool will be needed to install J hooks into the concrete ceiling. If a Ramset or
equivalent tool is used during the installation, the following safety procedures are required:
The installer must be licensed to use the product. Licensing takes about 20
minutes online at the web site www.ramset.com
.
Follow all of the safety requirements from the tools manufacturer.
Always Post at the front entrance of the store the warning sign provided by the
tools manufacturer.
Prior to using the Ramset inform the Store Management that Ramset will be used
during the install and it produces a loud sound every time it is used.
Prior to Installation:
GOLIATH will ship the Installation Kit to the store. The hardware will be on-site at least
one day prior to the planned installation date. The CIV will contact the Store Manager or
the Executive Assistant Manager at least seventy-two hours prior to any planned
installation activity and make every effort to accommodate the store’s expectations
regarding the installation, which may include swapping with nearby sites to accommodate
shipments and inventory counts. It is also recommended that the CIV call the site twenty-
four prior to the installation to accommodate any last-minute circumstances.