User's Manual
Walgreens Installation Guide
G-1-2002-2B
Walgreens Installation Guide 2B.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page: 2-35
10) The Help Desk will now perform the system test with the CMU and MEU while you
continue the installation.
11) The Help Desk will call you upon completion of their system test. The MEU can then
be powered down, disconnected from the CMU and moved to its permanent location
any time after the completion of the system test.
12) After the MEU is disconnected and powered down, then install the antennas on the
CMU and MEU. Never install the Antennas on the CMU and MEU when both
devices are near each other and powered on.
At the completion of the test return any spare CMU/MEU power cables to the Hot Spare
Kit and the MEU can be installed at its permanent location.
Power
Brick
Power
Outlet
CMU










