User's Manual
Walgreens Installation Guide
G-1-2002-2B
Walgreens Installation Guide 2B.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page: 2-24
Determine the Cable Pulls:
After completing the other components of the Pre-Installation Store Survey, then
determine the cable lengths and how to pull the coaxial cables in the store. Please review
the
Cable Pull section in this guide for more detailed information on pulling the cables.
Factors that must be considered when determining your cable pulls are:
1) Minimize the number of cables pulls. For example, all the cables including power
that go to the front of the store should be one cable pull, the cables going to the
back of the store would be another pull and then the center of the store would be
two pulls.
2) Determine the length of coaxial cable required for each antenna to reach the MEU.
This information will help determine how to label each cable.
3) Determine any obstructions in the ceiling that would prevent hinder or alter a cable
pull.
4) The cable pulls should occur in the following sequence:
The cable pull that includes the power for the MEU should always be the first
pull.
The cable pull that includes the stock room should be your second pull.
All other remaining cable pulls.
5) Cables must comply with National Electric Code (NEC) current new construction
standards.
6) The installation of the cables must comply with the standards defined in the
following table:
Issue Cable Tied to Touching Avoid
All pipes especially
water pipes
Never Never Yes
Threaded pipe
supports
Never Never Yes
Electrical Conduit Never Yes Yes
Ceiling Grid Wires Never Never Yes
HVAC Duct Never Yes Yes
Ceiling Tiles Never Never Yes










