User's Manual

Walgreens Installation Guide
G-1-2002-2B
Walgreens Installation Guide 2B.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page: 2-25
Pre-Installation Store Survey Check Off Form
Pre-Installation Store Survey Check Off Form
Status Process Task
CMU
Determine the CMU location
Determine the location of uninterrupted power for the CMU.
Determine the location of the network connection.
Primary
MEU
Determine the location of uninterrupted power for the MEU.
Determine the access for the power cable to the power location.
Determine the MEU location.
Determine the mounting method for the MEU.
Determine the distance from the MEU to Tx/ATA and Rx/ARA Antennae
locations.
Determine any issues including obstructions in the ceiling.
Determine ceiling height and roof girder height above ceiling grid.
Second
MEU
Determine if a second MEU is required
If needed, determine the location of the 24-hour uninterrupted power for the
second MEU and the location and mounting method for the second MEU.
Antennae
Placement
Determine the location of each Tx/ATA and Rx/ARA Antennae.
Mark the location on the floor of each Tx/ATA and Rx/ARA Antennae
Determine the length of coaxial cable for each antenna
Determine if the Rx/ARA antennas can be placed close to the mirrors in the
back of the store, if the mirrors are present.
Determine the access point for the cables to the stock room.
Cable Pulls
Determine all of your cable pulls.
Determine the sequence of your cable pulls.