User's Manual
Walgreens Installation Guide
G-1-2002-2B
Walgreens Installation Guide 2B.doc
Use or disclosure of this document is covered under the Non-Disclosure Agreement executed between the reader and Goliath Solutions,
LLC. This document and the information contained herein are privileged and should only be viewed by expressly authorized parties.
5/27/2008 Page: 2-26
Installation:
The following workflow is only a suggested division of labor and flow of the work during an
installation. Each installation crew can adjust the tasks for each member to be more
efficient for that team. This example is for a back stockroom. The stock room cables
would be pulled with the back pull. If you have a side stock room the center pull including
the stock room should be the second pull completed.
Sample Workflow of Installation with Two Technicians
Lead Technician Second Technician
Check-in with Store Management and
Goliath Help Desk.
Check-in with Store Management and
Goliath Help Desk.
Locate and verify Goliath Solutions
equipment
Bring the installation tools and supplies
into the store
Unpack and inventory equipmentPre-installation Store Survey (determine
equipment locations and installation
issues)
Label the cables
Install CMU – mounting, power and
communications. At the CMU location
temporarily connect the MEU to power on
the CMU and contact the Help Desk run a
system test.
Dispose of empty boxes and installation
material from the installation prep.
Pull cables for front of store to the
permanent MEU location and install
associated Tx/ATA and Rx/ARA
antennas.
Install MEU in permanent location after
completion of system test.
Pull Cables for back of store to the
permanent MEU location and install
associated Tx/ATA and Rx/ARA
antennas.
Pull cables for center of store to
permanent MEU location and install
associated Tx/ATA and Rx/ARA
antennas.
Connect pulled cables to MEU
Pull cables into Stock Room and install
associated Tx/ATA and Rx/ARA
antennas.
After all cables are connected to MEU
and the associated antennas, power on
the MEU.
Clean-up any debris left from the
installation.
Contact Goliath Solutions Help Desk for
check-out and final testing.
Remove installation tools and left-over
supplies & equipment from the store.
Tasks
Check-out with Store Management Check-out with Store Management










