DOOR PANEL INSTALLATION
mbedding box positioning.
E
1650
1850
1450
The upper part of the door panel should be placed at 1,65m. height roughly. The hole dimensions
will depend on the number of door panel modules.
The door panel has been designed to be placed under most of the environmental conditions.
However it's recommended to take additional cautions like rainproof covers. To obtain
a good quality picture on video door entry systems, avoid direct incidence from light sources.
reparing the cables entry.
P
Break the bottom flange to pass the cables through. In case of door panels
with more than one embedding box, break the side flanges and
attach the embedding boxes using UC junctions.
1
CE610
125
140
56
Modules
Model
W
H
D
2
CE620
125
257
56
3
CE630
125 mm.
374 mm.
56 mm.
109
DOOR PANEL INSTALLATION
lace the embedding box.
P
Pass the wiring through the hole made in the bottom part
of the embedding box. Level and flush the embedding
box. Once the embedding box is placed, remove the
protective labels from the attaching door panel holes.
ssembly the door panel modules.
A
Insert the header DOWN marked in the lower module and fix it by screwing the module
shafts.
Place the module spacer between lower and next modules, assuring that the spacer
adjustment notches are inside the panel. Fix the module by screwing the shafts.
Repeat this procedure in case of door panels with one more module (the maximum
number of modules placed vertically is three).
Insert the header UP marked in the last module and fix it by screwing the supplied screws.
In case of a pack code model 5403,
5403 color or 4403, skip this
paragraph.