GC9S96 Installation Manual

Table Of Contents
19


Center to center = 10” min / 24” max.
Vertical separation: 0” - 24”
Vent termination from wall = 8” min / 12” max.
Combustion air intake from wall = 6” max.
Vent and intake clearance to ground or anticipated snow
level = 12” min.
3” MIN
12” MIN TO GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL
3”MIN
24”MAX
12 M IN SE PARATION





If more than one direct vent furnace is to be installed
vertically through a common roof top, maintain the same
minimum clearances between the exhaust vent and air
intake terminations of adjacent units as with the exhaust
vent and air intake terminations of a single unit.
If more than one direct vent furnace is to be installed
horizontally through a common side wall, maintain the
clearances as in the Figure 20. Always terminate all
exhaust vent outlets at the same elevation and always
terminate all air intakes at the same elevation.
Vertical Installation
Horizontal Installation



Refer to the directions provided with the Concentric Vent Kit or
IO-619 for installation specications.

ELBOW









ELBOWS







ELBOWS



3”-24” BETWEEN PIPES





