Installation Instructions

*MEC96 & *CEC96
T
WO
-S
TAGE
G
AS
F
URNACES
IOG-2011L
01/2018
(Type FSP CATEGORY IV Direct
or Non Direct Vent Air Furnace)
These furnaces comply with requirements em-
bodied in the American National Standard / Na-
tional Standard of Canada ANSI Z21.47·CSA-2.3
Gas Fired Central Furnaces.
Installer:
Affix all manuals
adjacent to the unit.
A
s a professional installer you have an obligation to know
the product better than the customer. This includes all safety
precautions and related items.
Prior to actual installation, thoroughly familiarize yourself
with this Instruction Manual. Pay special attention to all
safety warnings. Often during installation or repair it is
possible to place yourself in a position which is more
hazardous than when the unit is in operation.
Remember, it is your responsibility to install the product
safely and to know it well enough to be able to instruct a
customer in its safe use.
Safety is a matter of common sense...a matter of thinking
before acting. Most dealers have a list of specific good
safety practices...follow them.
The precautions listed in this Installation Manual are intended
as supplemental to existing practices. However, if there is
a direct conflict between existing practices and the content
of this manual, the precautions listed here take precedence.
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION.
*NOTE: Please contact your distributor or our website for
the applicable Specification Sheet referred to in this manual.
is a registered trademark of Maytag Corporation or its related companies and is used under license. All rights reserved.
TABLE OF CONTENTS
S
AFETY CONSIDERATIONS .................................... 2
S
HIPPING INSPECTION ............................................ 4
E
LECTROSTATIC DISCHARGE (ESD) PRECAUTIONS ................... 4
TO THE INSTALLER .............................................. 5
PRODUCT DESCRIPTION......................................... 5
F
EATURES ....................................................... 5
PRODUCT APPLICATION ......................................... 5
LOCATION REQUIREMENTS & CONSIDERATIONS ........... 6
C
LEARANCES AND ACCESSIBILITY ................................... 7
EXISTING FURNACE REMOVAL ..................................... 8
THERMOSTAT LOCATION .......................................... 8
C
OMBUSTION & VENTILATION AIR REQUIREMENTS .................. 8
INSTALLATION POSITIONS ...................................... 9
H
ORIZONTAL APPLICATIONS & CONSIDERATIONS ..................... 9
F
URNACE SUSPENSION ........................................... 9
F
RONT COVER PRESSURE SWITCH TUBE LOCATION ................. 9
DRAIN TRAP AND LINES .........................................10
HORIZONTAL FURNACE LEVELING ................................10
ALTERNATE ELECTRICAL AND GAS LINE CONNECTIONS .............10
DRAIN PAN ....................................................10
FREEZE PROTECTION ............................................10
PROPANE GAS/HIGH ALTITUDE INSTALLATIONS ..........10
VENT/FLUE PIPE & COMBUSTION AIR PIPE .................10
D
UAL CERTIFICATION: NON-DIRECT/DIRECT VENT ................11
MATERIALS AND JOINING METHODS ..............................11
PROPER VENT/FLUE AND COMBUSTION AIR PIPING PRACTICES .....11
TERMINATION LOCATIONS ........................................12
CANADIAN VENT PIPE AND COMBUSTION AIR PIPE REQUIREMENTS ..12
STANDARD FURNACE CONNECTIONS ..............................13
VENT/FLUE PIPE ..............................................13
NON-DIRECT VENT (SINGLE PIPE) PIPING ........................15
VENT/INTAKE TERMINATIONS FOR INSTALLATION
OF
MULTIPLE DIRECT VENT FURNACES ........................17
CONCENTRIC VENT TERMINATION .................................18
SIDE WALL VENT KIT ..........................................18
CONDENSATE DRAIN LINES & DRAIN TRAP .................18
G
ENERAL DRAIN INFORMATION ...................................18
FIELD SUPPLIED DRAIN .........................................18
UPFLOW MODEL INSTALLED VERTICALLY ..........................19
DRAIN EXITING RIGHT SIDE .....................................19
DRAIN EXITING LEFT SIDE ......................................20
UPFLOW MODEL INSTALLED HORIZONTALLY
WITH
RIGHT SIDE DOWN .....................................20
UPFLOW MODEL INSTALLED HORIZONTALLY
WITH
LEFT SIDE DOWN ......................................20
COUNTERFLOW MODEL INSTALLED VERTICALLY...................21
DRAIN EXITING LEFT SIDE.....................................21
DRAIN EXITING RIGHT SIDE....................................22
COUNTERFLOW MODEL INSTALLED HORIZONTALLY WITH
RIGHT SIDE DOWN...........................................22
COUNTERFLOW MODEL INSTALLED HORIZONTALLY WITH
LEFT SIDE DOWN............................................23
5151 San Felipe Suite 500
Houston, TX 77056
www.goodmanmfg.com • www.amana-hac.com
© 2014-2018 Goodman Manufacturing Company, L.P.

Summary of content (60 pages)