Specifications
2 www.goodmanmfg.com SS-GMVC96
SS-GMVC96 www.goodmanmfg.com 3
GMVC96
0403BNA
GMVC96
0603BNA
GMVC96
0803BNA
GMVC96
0804CNA
GMVC96
1005CNA
GMVC96
1005DNA
GMVC96
1205DNA
Heating Data
High Fire Input¹ 40,000 60,000 80,000 80,000 100,000 100,000 120,000
High Fire Output¹ 38,400 57,600 76,800 76,800 96,000 96,000 115,200
Low-Fire Steady-State Input¹ 28,000 42,000 56,000 56,000 70,000 70,000 84,000
Low-Fire Steady-State Output¹ 26,880 40,320 53,760 53,760 67,200 67,200 80,640
AFUE² 96 96 96 96 96 96 96
Temperature Rise Range (°F) 35 - 65 20 - 50 35 - 65 25 - 55 35 - 65 35 - 65 35 - 65
Vent Diameter³ 2" - 3" 2" - 3" 2" - 3" 2" - 3" 2" - 3" 2" - 3" 2" - 3"
No. of Burners 2 3 4 4 5 5 6
Circulator Blower
Available AC @ 0.5" ESP 1.5 - 3 1.5 - 3 1.5 - 3 1.5 - 4 2 - 5 2 - 5 2 - 5
Size (D x W) 10" x 8" 11" x 8" 11" x 8" 11" x 10" 11" x 10" 11" x 11" 11" x 11"
Horsepower @ 1075 RPM ½ ½ ½ ¾ 1 1 1
Speed VS ECM VS ECM VS ECM VS ECM VS ECM VS ECM VS ECM
Electrical Data
Min. Circuit Ampacity⁴ 7.8 7.8 7.8 10.6 14.4 14.4 14.4
Max. Overcurrent Device (amps)⁵ 15 15 15 15 20 20 20
Shipping Weight (lbs) 114 117 120 141 143 153 156
¹ Natural Gas BTU/h
² DOE AFUE based upon Isolated Combuson System (ICS)
³ Installer must supply one or two PVC pipes: one for combuson air (oponal) and one for the ue outlet (required).
Vent pipe must be either 2" or 3" in diameter, depending upon furnace input, number of elbows, length of run
and installaon (1 or 2 pipes). The oponal Combuson Air Pipe is dependent on installaon/code requirements
and must be 2" or 3" diameter PVC.
⁴ Minimum Circuit Ampacity = (1.25 x Circulator Blower Amps) + ID Blower amps. Wire size should be determined
in accordance with Naonal Electrical Codes. Extensive wire runs will require larger wire sizes.
⁵ Maximum Overcurrent Protecon Device refers to maximum recommended fuse or circuit breaker size.
May use fuses or HACR-type circuit breakers of the same size as noted.
Notes
• All furnaces are manufactured for use on 115 VAC, 60 Hz, single-phase electrical supply.
• Gas Service Connecon ½" FPT
• Important: Size fuses and wires properly and make electrical connecons in accordance with the
Naonal Electrical Code and/or all exisng local codes.
• For boom return: Failure to unfold anges may reduce airow by up to 18%. This could result in performance
and noise issues.
• For servicing or cleaning, a 24" front clearance is required. Unit connecons (electrical, ue and drain)
may necessitate greater clearances than the minimum clearances listed above. In all cases, accessibility
clearance must take precedence over clearances from the enclosure where accessibility clearances are greater.
Product Specifications