User Manual

8
02 Installation Instructions
User Manual V1.3
Back-up Back-up
Load
On-grid
BatteryBattery
Battery
Back-up
Generator
Back-up
On-Grid
02 Installation Instructions
2.1 Unacceptable Installations
Please avoid the following installations which will damage the system or the Inverter.
The following installations should be avoided. Any damage caused will not be covered by the
warranty policy.
Single battery bank cannot be connected to
multiple inverters.
On-Grid or back-up side cannot be connected to
any AC generator.
Battery without ocial compatible statement
cannot be connected to inverter.
Back-up side cannot be connected to grid.
No parallel connection of the back-up is
allowed in general application. Please
contact the manufacturer rst for advanced
application.