Instructions / Assembly
AND
CHIMNEY AND DORMERS
STEP 37: ROOF BOARDS/ROOF FINISHERS
1: Place the 1 x 5 x 52” Roof Boards on top of the Roof Supports, fitting the tongue into the
groove of the Roof Starter. The holes in the Roof Boards should be centered over the Roof
Supports. There are seven Roof Boards on each side of the roof. If necessary place a scrap 2
x 4 board against the Roof Board and hammer on it to seat the tongue into groove for the
Roof Boards. Fasten each Roof Board to the Roof Supports with four 1-1/2” wood screws.
2: Place the 1 x 5 x 52” Roof Finisher at the end of the roof assembly and fasten to the Roof
Supports with four 1-1/2” wood screws. Each side of the roof gets one Roof Finisher.
Tip: Use the instructions provided with the Chimney and Dormers to build them. After putting
in three Roof Boards on the front roof STOP and then install the Chimney. Notice the mounting
block for the Chimney will get installed on the first Roof Board. Once all the Roof
Boards/Finishers are installed mount the Dormers as shown belowcentered on the roof.
FRONT OF PLAY SET
ON FIRST ROOF BOARD
LADDER
ROOF FINISHER
1 X 5 X 52"
DORMER
CHIMNEY
MOUNTING BLOCK
WOOD SCREW
1-1/2"
WOOD SCREW
1-1/2"
1 X 5 X 52"
ROOF BOARD
(FIRST ONE)
66