User Manual
STEP 48: REST SWING BEAM ON FORT
1: REST THE SWING BEAM ASSEMBLY ON TOP OF THE UPPER RAILING BOARDS OF THE
FORT.
2: THE END OF THE SWING BEAM WITH 2 HOLES SHOULD OVERHANG THE SWING BEAM
SIDE OF THE FORT. IN THE NEXT STEP YOU WILL ATTACH THE SWING BEAM LEGS ONTO THIS
END OF THE SWING BEAM.
SWING BEAM WITH IRON DUCTILE SWING HANGERS ATTACHED
SWING BEAM SIDE OF FORT
END WITH 2 HOLES
97