Installation & Assembly

3/8 X 3-1/2"
3/8" WASHER
LAG SCREW
2 X 4 X 54-1/2"
TARP BOARD
STEP 17: INSTALLING TARP BOARDS
1: FIND TWO 2 X 4 X 54-1/2" TARP BOARDS.
2: CENTER THE BOARD ACROSS THE ENDS OF THE SWING BEAM SIDE RAIL AND THE SIDE RAIL.
3: ATTACH THE TARP BOARDS WITH 3/8 X 3-1/2" LAG SCREWS AND 3/8" WASHERS.
4: REPEAT THIS PROCESS ON THE OPPOSITE SIDE OF THE FORT.
46