Installation & Assembly

STEP 26: REST SWING BEAM ON FORT
*TWO PEOPLE ARE REQUIRED FOR THIS STEP
1: LAY THE SWING BEAM ACROSS THE FORT AND POSITION THE LEGS UNDERNEATH THE END OF THE BEAM.
2: LINE UP THE PRE-DRILLED HOLES AND REST THE SWING BEAM ON TOP OF THE SWING BEAM SUPPORT PLATE AND
SWING LEGS. MAKE SURE THE IRON DUCTILES ARE FACING DOWN.
55