User Manual
GMC-I Messtechnik GmbH 65
14.10.4 Test Sequence PRCD-S (three-phase) – 18 Test Steps
Selection Examples
Simulation Interruption (Steps 1 to 10)
Simulation Conductor Exchange (Steps 11 to 16)
Simulation PE to Phase (Step 17)
Measurement of Protective Conductor Current with Current Clamp 
Transformer (Step 18) 
Semi-automatic Change of Fault Simulations (Statuses)
As an alternative to changing 
manually between the fault sim-
ulations via the parameter menu 
of the respective PRCD selec-
tion PRCD-S 1~, PRCD-K 1~ or 
PRCD-S 3~ at the test instru-
ment, it is possible to switch 
quickly and conveniently 
between the fault simulations. 
Select status parameter AUTO 
for this purpose. After replying 
to and storing each visual 
inspection, an automatic 
switch-over to the next fault simulation takes place. Individual fault 
simulations can be skipped by pressing key I
ΔN
 at the test instru-
ment or at the test plug.
15 Automatic Test Sequences – AUTO Function
Selecting Switch Position AUTO at the Test Instrument
When the rotary switch is set to AUTO, all existing test sequenes 
in the instrument are displayed, see Figure 15.4.
If there are no test sequences in the instrument, message „NO 
DATA“ appears.
15.1 General
Layout of the Test Sequences
If the same order of tests with subsequent report generation is to 
be performed repeatedly, as is, for example, specified by certain 
standards, we recommend using test sequences.
With the help of test sequences it is possible to compile auto-
matic test procedures on the basis of the manual individual mea-
surements. A test sequence consists of up to 200 individual test 
steps which have to be processed one after the other.
Basically, a distinction is made between three types of individual 
steps:
• Note (“visual Inspection” test step): the test procedure is inter-
rupted by a pop-up note for the test engineer. It is not contin-
ued before the test engineer acknowledges the note.
Example: Note prior to insulation resistance measurement: 
„Disconnect the device from the mains!“
• Visual inspection, testing and report: the test procedure is inter-
rupted by a pop-up window of a passed/failed evaluation, 
comments on and results of the evaluation are saved in the 
database.
• Measurement (“user-evaluated measurement” test step): Measure-
ment like the individual measurements performed by the test 
instruments with data storage and parameter configuration.
Creating Test Sequences with IZYTRONIQ
As of PROFITEST MASTER firmware version 1.7.0, test sequences 
are created at a PC with the help of the included IZYTRONIQ soft-
ware, and are then transferred to test instrument. Any number of 
test sequences can be created and stored at the PC in IZYTRONIQ. 
Up to 10 selected test sequences can be transferred to the test 
instrument.
No option for transferring test sequences from the test instrument 
back to the PC has been provided for because sequences can 
only be created, managed and stored at a PC.
General instructions regarding the creation of test sequences can 
be found in the online help provided with IZYTRONIQ.
AUTO










