Operation Manual

40 GMC-I Messtechnik GmbH
SECULIFEESXTRA
Load Curve Scenario 2 - I need to run a pure cut 300 Watt load curve, but there isn't a footswitch cable
available for my DUT. I need to test my DUT at 50, 300, 500, 800, and 1500 ohms.
Solution:
1) Select Load Curves from the main menu.
2) Select Configure Load Curve from the Load Curve Menu.
3) Press The Setup Loads tab at the top of the screen to configure the Loads
4) Select the List Based Loads option to configure the list of loads to be used for the test.
5) Press Clear List to remove all of the previous settings from the list of loads to be used.
6) Press the Add Load button and enter 50 in the number pad.
7) Press the Add Load button again and enter the values for the other loads to be used; 300, 500, 800,
1500. The loads do not need to be entered in sequence, they will automatically be sorted as they are
entered. If an incorrect load is accidentally entered, select the incorrect load by pressing on it and
then press the Delete Load button, it will be removed from the list. The screen should now look like
the following: