Operation Manual
GMC-I Messtechnik GmbH 41
SECULIFEESXTRA
8) Press the Setup Power tab at the top of the screen to configure the power setting for the test.
9) Select the Single Power Level tab to configure the test for one power setting.
10)Press the DUT Power setting button and enter 300 in the number pad. The screen should look like the
following:
11)Press the DUT tab at the top of the screen to configure the settings for the DUT trigger.
12)Select the Operator option for DUT activation.