RF Measure: I need to configure an Autosequence step to take an RF current measurement with a 200
ohm load. My measurement tolerance is 315mA, ±25mA.
Solution:
1) From the Autosequence menu, select Create New Sequence. Then press Add Step.
2) Select the desired location for the new step and press OK.
3) The new step will always default to an instruction type step. Select the RF Energy / Leakage option
button near the bottom of the screen.
4) Press the title Text box to change the step title as desired. You will need to use an external keyboard
for this.
5) Press the Instructions to Operator text box to enter any instructions that the user might need to
perform at this step of the autosequence.
6) Press the Meter Setup button to configure the measurement mode and tolerance.
7) Press the Test Load button to open the Load Configuration menu.
8) Press the Internal Load value button to change the internal load to 200 ohms. By default, the user will
not be able to change the load resistance once the test is running. If you would like for the operator to
be able to change the load, check the box next to Allow Operator to modify load.