Operation Manual

GMC-I Messtechnik GmbH 45
SECULIFEESXTRA
Load Curve - I need to run a pure cut 300 Watt load curve, and there isn't a footswitch cable available for
my DUT. I need to take 10 measurements with loads from 50 to 5000 ohms.
Solution:
1) From the Autosequence menu, select Add Step.
2) Select the desired location for the new step and press OK.
3) The new step will always default to an instruction type step. Select the Load Curve option button near
the bottom of the screen.
4) Press the Title text box to change the step title as desired. You will need to use an external keyboard
for this.
5) Press the Instructions to Operator text box to enter any instructions that the user might need to
perform at this step of the autosequence.