Operation Manual

GMC-I Messtechnik GmbH 47
SECULIFEESXTRA
11)Press the Setup Power tab at the top of the screen to configure the power setting for the test.
12)Select the Single Power Level tab to configure the test for one power setting.
13)Press the DUT Power setting button and enter 300 in the number pad. The screen should look like the
following:
14)The configuration is complete for this step. Press Back to Step Edit and then Done to return to the
Autosequence Summary screen.
Auto CQM - I need to test the CQM input on my generator. My generator service manual says to
increase the CQM resistance starting at 120 ohms until the CQM alarm occurs. The CQM trip resistance
should be 135 ohms +/- 5 ohms.
Solution:
1) From the Autosequence menu, select Add Step.
2) Select the desired location for the new step and press OK.
3) The new step will always default to an instruction type step. Select the REM/ARM/CQM option button
near the bottom of the screen.
4) Press the Title text box to change the step title as desired. You will need to use an external keyboard
for this.