Operation Manual

GMC-I Messtechnik GmbH 81
SECULIFEESXTRA
As the load curve runs, the screen will be updated with the measured power from the DUT. At the end of
the load curve, there will be buttons available to save the load curve results or view the individual data
points.
The REM/ARM/CQM key from the main menu will access the Return Electrode Control Quality Monitor
Test. This menu allows for the user to control the resistance between the blue CQM terminals on the front
of the SECULIFE ES
XTRA.
REM/ARM/CQM