User Manual

APPENDIX
COUPLING GUARD INSTALLATION ...................59
CHANGING THE IMPELLER ........................62
CONDITION MONITORING DEVICES...................66
METRIC CONVERSION ...........................86
COUPLING GUARD INSTALLATION
s
! WARNING
Before assembly or disassembly of the coupling guard is
performed the motor must be de-energized, the motor
controller/starter put in a locked-out position and a
caution tag placed at the starter indicating the
disconnect. Replace coupling guard before resuming
normal operation of the pump. Goulds Pumps, Inc.
assumes no liability for avoiding this practice.
Simplicity of design allows complete assembly of the
coupling guard in about five minutes.
ASSEMBLY:
NOTE: If end plate (pump end) is already
installed, make any necessary coupling
adjustments and then proceed to Step 2.
1. Align end plate (pump end) to the Bearing Frame
and install
1
2
- 13x
3
4
" hex head bolts.
(Fig. B)
NOTE: Coupling adjustments should be
completed before proceeding with coupling guard
assembly.
2. Spread bottom of coupling guard half (pump end)
slightly and place over pump end plate as shown
in Figure C. The annular groove in the guard half
locates around the end plate. See detail drawing,
Figure E.
3296 M Group 6/05 59
Fig. A
End Plate
(Driver End)#234A
End Plate
(Pump End)
Guard Half
#501B (2 Reqd.)
3
8
"-16 Nut (3 Reqd.)
3
8
" Washer (6Reqd.)
1
2
-13 x
3
4
" Hex Head Bolt (4 Reqd.)
3
8
- -16 x 2" Hex Head Bolt (3
Fig. B