Product Manual

www.LevelGuardProducts.com | 9
Sump Pump Switch
Electronic Sump Pump Switch
®
®
®
®
®
Fluid Control Products
Electrical Connection
WARNING: Perform ALL cord management and routing BEFORE turning on main power.
1. Find a path where sump pump and LevelGuard
®
Sewage Pump Switch cords will be
protected from all sharp objects, hot surfaces, oils, and chemicals.
2. Use provided tie straps to fasten cords to the discharge pipe.
3. Plug pump cord into back of the LevelGuard® Sewage Pump Switch piggyback plug.
DANGER: The Ground Fault Circuit Interrupt (GFCI) receptacle or control box must
be installed by a qualied electrician in accordance with all applicable codes and
ordinances.
Before you connect to the
GFCI, a qualied electrician
must test the GFCI to assure
that it is operating properly
(see below for recommended
termination for Pigtail
connection).
4. Insert Sewage Pump Switch
plug ONLY into a GFCI ground-
fault protected outlet that is
operating properly.
5. Recheck plugs or terminals for
rm connection.
5. Turn Main Power on to supply
power.
6. Turn Main Power to circuit
O N ”.
7. Proceed to "TEST And
CALIBRATION" section.
GFCI
Protected
Outlet
Before you plug in-01
UNPLUG
Discharge Pipe