User's Manual

Pressure Relief Procedure
6 3A0245A
3. Insert cotter pin.
4. Place one hand on control tube and one hand at
bottom of mud tub while in use.
5. Place tape at bottom of joint (slide tube forward to
feed tape).
6. Lead with head of taper to make tracking easier.
Large trigger feeds material through tool. Small
trigger retracts creasing wheel.
7. Roll tape over seam with only one wheel in contact
with wall until approximately three inches from end
of seam.
8. Stop completely and pull tube back to cut tape.
9. Use drywall knife to detail seams and overlap.
NOTE: Clean all tools thoroughly after every use. Use a
brush and water to remove all joint compound from
tools. Once tools have been cleaned, lightly oil using
any light machine oil.
Pressure Relief Procedure
1. Turn flow control knob OFF.
2. Point applicator into hopper and trigger to relieve
pressure.
3. Fluid from pressure relief valve can splash in eyes
or skin and cause serious injury. Keep hands clear
of pressure relief valve. Wear safety glasses.