Installation & Assembly
NO. COMPONENT
QTY.
P1
TABLE TOP \^/ITH APRON
P2 TABLE LEG
4
P3 SIDE STRETCHER 2
P4 BOTTOM PANEL
HATHAWAY C
ASSE
OUNT
MB
ER
LY IN
HEIG
STRUCTIONS
HT TABLE
PARTS UST
(FOR
1 TABLE)
STEP 1
I
j
?
j
U
I
corner Block
Apron
a) With the assistance of another
person, place
Table Top
(P1)
bottom side up on a flat and soft
surface to
prevent
scratch and damage.
b) Use a Phillip Screwdriver to unscrew the screws on the wood blocks that are holding the box
containing the Table Legs
(P2).
Remove the screws and wood blocks completely discard
these screws and wood blocks.
c) Position Table Leg
(P2)
against the corner of the table apron and align the screw holes on
(P2)
to the screw holes on the corner block.
d) Insert Screw
(H'1)
fitted with Spring Washer
(H3)
and Flat Washer
(H4)
through each hole on
the corner block into screw hole on
(P2).
Use Allen Key
(H7)
to drive
(H1)
to fasten Table Leg
(P2)
to corner block.
Do not tighten
(H1)
completely until both screws are in
place
on each leg. Do not over tighten.
e) Repeat the above assembly
procedures
for the other three legs.
f) Use a mallet or hammerto
gently
nail Leg Stud
(Hg)
into each end ofthe Leg.
HARDWARE UST
(FOR
1 TABLE)
NO. DESCRIPTION
QTY.
EXTRA
H,1 JCBC SCREW M8X5O
8 1
H2
JCBC SCREW N,46X9O 4 1
H3
N48 SPRING WASHER
@
8
2
H4 M8 FLAT WASHER
8
2
H5
BOLT & NUT O--O 4 1
H6 M6 FLAT WASHER
4
2
H7 ALLEN KEY M8
H8 ALLEN KEY M6
H9 LEG STUD
.O
4 1
*
Extra Hardware For Spare Use
Page 2/3



