User's Manual

SmartDie
Screed Box
14 313787C
3. Set SmartDie
screed box on ground but not in
locked open position.
4. Remove hairpin cotter pin connecting SmartDie
screed box to rod clevis.
5. Press down SmartDie
lever.
6. Disengage SmartDie
screed box rod from Smart-
Die
lever and carefully remove SmartDie
.
Adjustment
The height and angle of the SmartDie
screed box can
be adjusted to ensure a solid line of material on any sur-
face. For optimum delivery of thermoplastic material,
make sure the SmartDie
screed box die runner is par-
allel to road surface.
1. Loosen two bolts on SmartDie
screed box mount-
ing bracket.
2. Slide mount down until leading box edge of Smart-
Die
screed box die runner is just off of the ground
surface. For best performance, raise leading edge
0 - 0.03 in. (0 - 0.076 cm) off ground surface.
3. Tighten bolts on screed box mounting bracket.
ti14267a
ti14155a
ti14270a
ti14414a
SmartDie
Screed Box Die Runner
SmartDie
Screed Box Gate
SmartDie
Screed Box Trough
ti14504a
ti14505a
ti14545a
0 - 0.030 in.
SmartDie
Screed Box Gate
SmartDie
Screed Box Trough
SmartDie
Screed Box Die Runner
ti14506a