User's Manual

Installation
4 332453C
S100 Low Level Sensors,
24R935
1. Perform the Shutdown procedure in the Exact-
aBlend AGP Advanced Glazing Proportioner,
Setup-Operation manual.
2. Remove the air shut off valve cable from port 1
located on the Fluid Control Module (FCM).
3. Install the splitter into port 1.
4. Install the air shut off valve cable and the low level
cable end labeled “J1B” into the splitter.
5. Route the low level cable along the boom. Follow
the air hoses and electrical lines that are installed.
6. Mount the sensor to the bracket.
7. Attach the bracket to the electrical enclosure for the
base ram. Torque the bolts to 5.1 ft-lb (6.9 N•m).
8. Attach the bracket to the pump mast for the catalyst
ram. Torque the bolts to 5.1 ft-lb (6.9 N•m).
x 2