User's Manual

Installation
332453C 7
USB Kit, 24R936
1. Perform the Shutdown procedure in the Exact-
aBlend AGP Advanced Glazing Proportioner,
Setup-Operation manual.
2. Mount the USB Module to the side of the electrical
enclosure. Torque the bolts to 2.6 ft-lb (3.5 N•m).
3. Connect the adapter to the USB Module. Connect
the CAN cable to the adapter. Route the CAN cable
along the boom. Follow the air hoses and electrical
lines that are installed.
4. Connect the CAN cable to the Fluid Control Module
(FCM).
5. Install the software upgrade token (16V853) into the
Display Module (DM) and cycle the power. Refer to
the Graco Control Architecture
Module Program-
ming manual for more details.
6. Install the software upgrade token (16V853) into the
USB module and cycle the power.
7. Refer to the ExactaBlend AGP Advanced Glazing
Proportioner, Setup-Operations manual for screen
details.