User's Manual
Service
3A1164B 37
Replacing Solenoids
The Fluid Station Control Box has a minimum of 4 sole-
noids. If you have options installed, you have additional
(optional) solenoids for each. See Table 6 and Sche-
matic Diagrams, page 26.
To replace a single solenoid:
1. Follow Before Servicing, page 30, and shut off
power at main circuit breaker.
2. Disconnect 2 solenoid wires from control board
(302). See F
IG. 17 and System Electrical Sche-
matic, page 29.
3. Unscrew 2 screws and remove solenoid (318). F
IG.
19.
4. Install new solenoid (318).
5. Connect 2 wires (N) to control board (302). Solenoid
wires are polarized (red +, black –). Refer to Sys-
tem Electrical Schematic, page 29.
Replacing Control Board Fuse
1. Follow Before Servicing, page 30.
2. Locate fuse F1 on the control board. See F
IG. 18.
Remove the screw and metal strap.
3. Pull the fuse away from the board.
4. Install the new fuse (343).
Replacing the fuse with a non-Graco fuse voids the IS
system safety approval.
Fuse Part No. Description
F1 123690 Fuse; 125 mA, intrinsically safe
Table 6: Control Box Solenoids
Solenoid Actuates
Standard
1 Dose Valve A
2 Dose Valve B
3 Air Purge Valve
4 Solvent Purge Valve
Optional
5 Third Flush Valve
6 Dump Valve A
7 Dump Valve B
F
IG. 19: Replacing Solenoids
318
TI15917a
N










