User's Manual

Operation
38 3A2175A
Shutdown
1. Park pumps.
a. From the Home screen, press and select
Standby mode.
b. Press . Material will dispense. Pump will
park automatically. Once pump is parked, pump
will stop moving.
If a dispense gun with a trigger is installed,
pulling the trigger will begin a park operation.
Material will dispense.
2. Press the enable/disable key on the ADM to
disable the ADM.
3. Turn main power switch (MP) to OFF position.
4. Close A (Red) and B (Blue) fluid supply valves (FV),
if equipped, or remove fluid pressure at supply
device.
5. Perform Pressure Relief Procedure on page 38.
6. Shut down feed pumps as required. See feed pump
manual.
Pressure Relief Procedure
1. Shut off feed pumps and agitator, if used.
2. Turn PRESSURE RELIEF/DISPENSE valves (SA,
SB) to PRESSURE RELIEF/CIRCULATION .
Route fluid to waste containers or supply tanks.
Ensure gauges drop to 0.
3. For models with an dispense valve with a safety
lock, engage gun safety lock.
4. Relieve pressure in dispense valve. See dispense
valve manual.
ti9883a1
FV
ti9879a1
SA
SB