User's Manual

Installation
22 3A2894F
Installation
1. Locate the Machine Base.
Locate the machine on a level surface. Refer to Dimen-
sions, page 76, for space requirements.
2. Assemble the Hose Clamps
and Swivel Assembly onto
the Boom Base.
a. Torque the swivel assembly fasteners to 24 ft-lb
(33 N•m).
b. Hand tighten all hose clamps.
NOTE: Refer to steps 8 and 10 for visual clarity of hose
clamp placement.
NOTICE
To avoid flow meter malfunction, do not use PTFE
tape on NPT threads. Only apply pipe sealant, Loc-
tite
®
#565 or equivalent, to all NPT threads when
installing.
S100 Shown
Calibration Check only
Swivel
Assembly